Renovation and basement construction at Korte Leidsedwarsstraat 129-137

Besides constructing Heineken Hoek on Leidseplein, we are currently also renovating Korte Leidsedwarsstraat 129-137 (consisting of two buildings) at the rear.

At the side of Korte Leidsedwarsstraat 129-131, we are restoring the foundation and excavating a basement. The basement floor has been reinforced and will be poured this week. The aim is to have the entire basement and ground floor shell ready by the end of 2023. Repair of the façade will begin after that: façade frames will be replaced and painted, and masonry cleaned and repaired where necessary. The apartment studios on the upper floors are being renovated at the same time.

The basement (headroom approximately 2.4 meters) and ground floor are intended for hospitality and will have a total surface area of around 200 m². The apartment studios on the upper floors are approximately 25 to 50 m².

In the adjacent building number 133-137, the ground floor is being converted into office space. The apartment studios above have been renovated and are occupied.