
The last part of the basement floor of The Bridge is being cast
Today, the last part of the basement floor of The Bridge is being cast. The reinforcement and casting of columns and walls have already begun on the northern side of the construction pit. After the supporting structure (week 38/39) and the load-bearing beams for the ground floor have been constructed, the ground floor will be…